Apart from mandatory requirements for the processing of net-metering, further safety steps have to be considered for the protection of inverters, solar panels, DC wiring, and mounting frames.
A minimum of two separate dedicated and interconnected earth electrodes must be used for the earthing of the solar PV system support structure with a total earth resistance not exceeding 5 ohms as below:
Lightning (surge) arrestors are designed to absorb voltage spikes caused by electrical storms and effectively allow the surge to bypass power wiring and your equipment. The applicant has to make sure that the distributed generation facility is separately grounded and the lightning arrestors are provided.